Clough has been awarded the South Flank Non-Process Infrastructure Project by BHP as part of BHP’s South Flank Iron Ore project. The South Flank Non-Process Infrastructure Project is located approximately 10km south of the existing MAC site, and approximately 130km north west of Newman WA. Clough Projects Australia has been engaged to design and construct the Non-Process Infrastructure (NPI) facilities to support mining activities at the new BHP South Flank mine and Ore Handling Plant at MAC.

 

Expression of Interest (EOI) list

Package Name

EOI Close Date

Estimated Tender Date

Link

Water Pumps & Standpipes

Closed

Closed

https://gateway.icn.org.au/project/3905/bhp-south-flank-iron-ore-project?st=projects&psid=1535358016?psid=1535358016

Heavy and Light Vehicle wash supply and install

Closed

Closed

https://gateway.icn.org.au/project/3905/bhp-south-flank-iron-ore-project?st=projects&psid=1535358016?psid=1535358016

Road Surfacing – supply and install

Closed

Closed

https://gateway.icn.org.au/project/3905/bhp-south-flank-iron-ore-project?st=projects&psid=1535358016?psid=1535358016