Sunrise Energy

Saldanha, South Africa

CMR Marine

The facility uses a floating multi-buoy morring system (MBM) where vessels of size 300GT – 20000GT may be received. A flexible hose connects the offloading vessel to a subsea PLEM (Pipeline End Manifold) which via an undersea pipeline of approximately 3.2 kilometres and an overland pipeline of approximately 2.1 kilometres, transports the LPG to the bullets at the storage terminal.

The near shore marine construction of the facility took 14 months to complete. Clough Murray & Roberts’ scope was completed very sucessfully, delivering the project on budget and on time. Utilising world leading engineering, construction management and project managmeent tools and resources the project was delivered to specification and is considered of world world class quality standard.

Through the implementation of our propriety Major Accident Prevention (MAP) HSE system, we were able to fulfil our goal of Zero Harm with no lost time injuries (LTIs) over duration of the project.

Fortescue Metals Group

Port Hedland, Western Australia, Australia

BAM Clough

The BAM Clough Joint Venture (BAM Clough) was awarded a design and construction contract for a fifth iron ore loading berth at Anderson Point Facility (AP5) in Port Hedland, Western Australia.

The works include the design and construction of a 306 metre long wharf extension, seven berthing dolphins, and the supply and installation of wharf  conveyor modules.

Clough engineers, constructs, commissions and maintains critical facilities for the Mining, Energy, and Infrastructure industries.

Saldahna Bay LPG Import Terminal
Saldahna Bay LPG Import ...Learn More

Saldahna Bay LPG Import Terminal

Learn More

Sunrise Energy

Saldanha, South Africa

CMR Marine

The facility uses a floating multi-buoy morring system (MBM) where vessels of size 300GT – 20000GT may be received. A flexible hose connects the offloading vessel to a subsea PLEM (Pipeline End Manifold) which via an undersea pipeline of approximately 3.2 kilometres and an overland pipeline of approximately 2.1 kilometres, transports the LPG to the bullets at the storage terminal.

The near shore marine construction of the facility took 14 months to complete. Clough Murray & Roberts’ scope was completed very sucessfully, delivering the project on budget and on time. Utilising world leading engineering, construction management and project managmeent tools and resources the project was delivered to specification and is considered of world world class quality standard.

Through the implementation of our propriety Major Accident Prevention (MAP) HSE system, we were able to fulfil our goal of Zero Harm with no lost time injuries (LTIs) over duration of the project.

Anderson Point Facility (AP5)
Anderson Point Facility ...Learn More

Anderson Point Facility (AP5)

Learn More

Fortescue Metals Group

Port Hedland, Western Australia, Australia

BAM Clough

The BAM Clough Joint Venture (BAM Clough) was awarded a design and construction contract for a fifth iron ore loading berth at Anderson Point Facility (AP5) in Port Hedland, Western Australia.

The works include the design and construction of a 306 metre long wharf extension, seven berthing dolphins, and the supply and installation of wharf  conveyor modules.

JKC Australia LNG (JGC Corporation, KBR and Chiyoda Corporation JV)

Darwin, Northern Territory, Australia

BAM Clough Joint Venture was awarded the contract to design and construct the Ichthys LNG Project Product Loading Jetty located at Blaydin Point, Darwin, Northern Territory. Gas from the Ichthys Field will be transported from the offshore CPF through a subsea pipeline more than 885 kilometres to the onshore LNG processing plant located at Blaydin Point.

The Product Loading Jetty Work includes typical piled with crossheads trestle with concrete superstructure, loading platform for LNG and LPG / condensate, the provision of seawater intake including pump casing and slope protection, waste water outfall structures, navigation aids, marine operations, corrosion and cathodic protection systems.

Bechtel

Onslow, Western Australia, Australia

BAM Clough

BAM Clough was awarded the contract by Bechtel to design and construct the Product Loading Facility (PLF) and Tug Berths associated with the Wheatstone Project LNG Plant near Onslow in Western Australia.

The scope consists of a 1.2 kilometre jetty with Marine Operations Platform, product loading platform incorporating a single LNG and Condensate load-out berth with associated breasting and mooring dolphin structures. Design, fabrication of topside piperack modules and platform modules with piping installation, insulation, module testing and ultimate completed piping modules installation and hook-up with final testing also forms part of the scope.

Chiyoda JGC JV

Papua New Guinea, Papua New Guinea

BAM Clough

Chiyoda JGC Joint Venture (CJJV) awarded the contract to design and construct the LNG and condensate offloading jetty for the PNG LNG project to the BAM Clough Joint Venture. The LNG and condensate jetty was constructed adjacent to the planned LNG facility twenty kilometres northwest of Port Moresby on the coast of the Gulf of Papua.

The scope included the design and construction of a 2.4 kilometre long trestle with substation platform, loading platform and single LNG loadout berth.

Ichthys LNG Product Loading Jetty
Ichthys LNG Product Load...Learn More

Ichthys LNG Product Loading Jetty

Learn More

JKC Australia LNG (JGC Corporation, KBR and Chiyoda Corporation JV)

Darwin, Northern Territory, Australia

BAM Clough Joint Venture was awarded the contract to design and construct the Ichthys LNG Project Product Loading Jetty located at Blaydin Point, Darwin, Northern Territory. Gas from the Ichthys Field will be transported from the offshore CPF through a subsea pipeline more than 885 kilometres to the onshore LNG processing plant located at Blaydin Point.

The Product Loading Jetty Work includes typical piled with crossheads trestle with concrete superstructure, loading platform for LNG and LPG / condensate, the provision of seawater intake including pump casing and slope protection, waste water outfall structures, navigation aids, marine operations, corrosion and cathodic protection systems.

Wheatstone Project Jetty
Wheatstone Project JettyLearn More

Wheatstone Project Jetty

Learn More

Bechtel

Onslow, Western Australia, Australia

BAM Clough

BAM Clough was awarded the contract by Bechtel to design and construct the Product Loading Facility (PLF) and Tug Berths associated with the Wheatstone Project LNG Plant near Onslow in Western Australia.

The scope consists of a 1.2 kilometre jetty with Marine Operations Platform, product loading platform incorporating a single LNG and Condensate load-out berth with associated breasting and mooring dolphin structures. Design, fabrication of topside piperack modules and platform modules with piping installation, insulation, module testing and ultimate completed piping modules installation and hook-up with final testing also forms part of the scope.

PNG LNG Project Marine Jetty
PNG LNG Project Marine J...Learn More

PNG LNG Project Marine Jetty

Learn More

Chiyoda JGC JV

Papua New Guinea, Papua New Guinea

BAM Clough

Chiyoda JGC Joint Venture (CJJV) awarded the contract to design and construct the LNG and condensate offloading jetty for the PNG LNG project to the BAM Clough Joint Venture. The LNG and condensate jetty was constructed adjacent to the planned LNG facility twenty kilometres northwest of Port Moresby on the coast of the Gulf of Papua.

The scope included the design and construction of a 2.4 kilometre long trestle with substation platform, loading platform and single LNG loadout berth.

Woodside Energy Limited

Karratha, Western Australia, Australia

BAM Clough Joint Venture

BAM Clough Joint Venture was awarded the contract to construct a new LNG Jetty as part of the Pluto LNG Project for Woodside on the Burrup Peninsula near Dampier in Western Australia.

Design and construction of a 300 metre long approach LNG jetty including a 40 x 50 metre platform, four breasting dolphins, six mooring dolphins and navigational aids.

Woodside Energy Limited

Dampier, Western Australia, Australia

Harbourworks Clough Joint Venture (now BAM Clough Joint Venture)

The Harbourworks Clough Joint Venture (HCJV, now BAM Clough) completed a substantial contract to undertake construction of a 150 metre long jetty extension to Woodside Energy’s existing LNG export marine terminal, at Withnell Bay near Dampier, in Western Australia. The project provided an additional berth loading facility for LNG export tankers with a capacity up to 145,000 cubic metres, as part of Woodside Energy’s LNG Train V Expansion Project.

Thames Water Ballarat Pty Ltd

Ballarat, Victoria, Australia

Design and construction of two water treatment plants at Lal Lal and White Swan reservoirs. Each plant has a capacity of 65 megalitres per day together with associated pumping stations, clear water storages and water mains.

Pluto LNG Jetty
Pluto LNG JettyLearn More

Pluto LNG Jetty

Learn More

Woodside Energy Limited

Karratha, Western Australia, Australia

BAM Clough Joint Venture

BAM Clough Joint Venture was awarded the contract to construct a new LNG Jetty as part of the Pluto LNG Project for Woodside on the Burrup Peninsula near Dampier in Western Australia.

Design and construction of a 300 metre long approach LNG jetty including a 40 x 50 metre platform, four breasting dolphins, six mooring dolphins and navigational aids.

Woodside LNG Jetty – Train V Expansion
Woodside LNG Jetty ̵...Learn More

Woodside LNG Jetty – Train V Expansion

Learn More

Woodside Energy Limited

Dampier, Western Australia, Australia

Harbourworks Clough Joint Venture (now BAM Clough Joint Venture)

The Harbourworks Clough Joint Venture (HCJV, now BAM Clough) completed a substantial contract to undertake construction of a 150 metre long jetty extension to Woodside Energy’s existing LNG export marine terminal, at Withnell Bay near Dampier, in Western Australia. The project provided an additional berth loading facility for LNG export tankers with a capacity up to 145,000 cubic metres, as part of Woodside Energy’s LNG Train V Expansion Project.

Ballarat Water Treatment Project
Ballarat Water Treatment...Learn More

Ballarat Water Treatment Project

Learn More

Thames Water Ballarat Pty Ltd

Ballarat, Victoria, Australia

Design and construction of two water treatment plants at Lal Lal and White Swan reservoirs. Each plant has a capacity of 65 megalitres per day together with associated pumping stations, clear water storages and water mains.