Arrow Energy

Surat Basin, Queensland, Australia

Clough AMEC

The Daandine Expansion project requires modifications to existing infrastructure and installation of new infrastructure to produce an additional 50 TJ/day of sales gas. The key objectives are to implement the project in the most cost effective manner with the shortest possible duration, minimise disruptions to operations of existing facilities and in full compliance with the technical, operational and HSE requirements. Clough provided engineering services for the Concept SELECT stage and FEED DEFINE stage for the existing field compression station, including a HP pipeline off-take connection to a third party in Queensland.

The Clough AMEC Joint Venture was awarded an Engineering, Procurement and Construction Management (EPCM) contract for Arrow Energy’s Daandine Expansion Project. The contract included the expansion of the existing central gas processing facility with three new reciprocating, gas-driven compressors and associated process and utility plant, increasing the current number of wells in the Daandine gas field by 22.

 

JKC Australia LNG (JGC Corporation, KBR and Chiyoda Corporation JV)

Browse Basin, Western Australia, Australia

Clough Doris

Clough DORIS Joint Venture (CDJV) was awarded a contract by INPEX Operations Australia Pty. Ltd, for the provision of Offshore Integrated Project Management Support Services (IPMS) for the Ichthys LNG project

Gas from the Ichthys Field, in the Browse Basin approximately 200 kilometres offshore of Western Australia, will undergo preliminary processing offshore to remove water and extract condensate. The gas will then be exported to onshore processing facilities in Darwin via an 885km subsea pipeline. The Ichthys Project is expected to produce 8.4 million tonnes of LNG and 1.6 million tonnes of LPG per annum, along with 100,000 barrels of condensate per day at peak.

The CDJV scope of work includes overseeing detailed engineering design, procurement, fabrication, tow to site, and offshore hook-up of the Central Processing Facility (CPF) and Floating Production, Storage and Offloading vessel (FPSO) for the project.

Clough engineers, constructs, commissions and maintains critical facilities for the Mining, Energy, and Infrastructure industries.

Daandine Expansion Project (Concept, FEED and EPCM)
Daandine Expansion Proje...Learn More

Daandine Expansion Project (Concept, FEED and EPCM)

Learn More

Arrow Energy

Surat Basin, Queensland, Australia

Clough AMEC

The Daandine Expansion project requires modifications to existing infrastructure and installation of new infrastructure to produce an additional 50 TJ/day of sales gas. The key objectives are to implement the project in the most cost effective manner with the shortest possible duration, minimise disruptions to operations of existing facilities and in full compliance with the technical, operational and HSE requirements. Clough provided engineering services for the Concept SELECT stage and FEED DEFINE stage for the existing field compression station, including a HP pipeline off-take connection to a third party in Queensland.

The Clough AMEC Joint Venture was awarded an Engineering, Procurement and Construction Management (EPCM) contract for Arrow Energy’s Daandine Expansion Project. The contract included the expansion of the existing central gas processing facility with three new reciprocating, gas-driven compressors and associated process and utility plant, increasing the current number of wells in the Daandine gas field by 22.

 

Ichthys Offshore Integrated Project Management Support Services (IPMS)
Ichthys Offshore Integra...Learn More

Ichthys Offshore Integrated Project Management Support Services (IPMS)

Learn More

JKC Australia LNG (JGC Corporation, KBR and Chiyoda Corporation JV)

Browse Basin, Western Australia, Australia

Clough Doris

Clough DORIS Joint Venture (CDJV) was awarded a contract by INPEX Operations Australia Pty. Ltd, for the provision of Offshore Integrated Project Management Support Services (IPMS) for the Ichthys LNG project

Gas from the Ichthys Field, in the Browse Basin approximately 200 kilometres offshore of Western Australia, will undergo preliminary processing offshore to remove water and extract condensate. The gas will then be exported to onshore processing facilities in Darwin via an 885km subsea pipeline. The Ichthys Project is expected to produce 8.4 million tonnes of LNG and 1.6 million tonnes of LPG per annum, along with 100,000 barrels of condensate per day at peak.

The CDJV scope of work includes overseeing detailed engineering design, procurement, fabrication, tow to site, and offshore hook-up of the Central Processing Facility (CPF) and Floating Production, Storage and Offloading vessel (FPSO) for the project.

Chevron Australia

Barrow Island, Western Australia, Australia

Kellogg Joint Venture - Gorgon (KJV-G)

Clough, as part of Kellog​​g Joint Venture, is participating in Australia’s largest ever reso​urce project through a contract to Engineer, Procure and Construction Manage (EPCM) the LNG downstream and logistics portion of the Chevron-operated Gorgon LNG Project.

The LNG facility consists of three 5 million tonne per annum (MTPA) LNG trains, gas processing and treatment facilities, product storage and offloading, complete offsites, utilities and accommodations; including a 300TJ/d domestic gas plant. The EPCM effort is a modular construction strategy to minimize impact on the island during the construction phase and is being conducted from two main operating centres locate​d in Perth and London with support from global centres in USA, Singapore, Indonesia and Japan.

Iluka Resources Limited

Ouyen, Victoria, Australia

The Murray Basin Stage 2 Development include the upgrade to Iluka’s existing mineral separation plant in Hamilton. The EPCM contract includes construction of a re-locatable mining unit weighing approximately 900 tonnes and concentrator plants, together with associated infrastructure

The award of this EPCM contract followed completion of a Definitive Feasibility Study, which was successfully undertaken by Clough on behalf of Iluka.

 

Newmont Boddington Gold Mine JV

Boddington, Western Australia, Australia

Aker Kvaerner Clough Murray & Roberts Joint Venture

Clough Limited, as part of a joint venture with Murray & Roberts and Aker Solutions, was engaged by the participants in the Boddington Gold Mine to develop the 35 Mtpa Boddington Copper/Gold project which is located 135 kilometers south-east of Perth. The contract included full EPCM management of the project.

Gorgon Downstream EPCM
Gorgon Downstream EPCMLearn More

Gorgon Downstream EPCM

Learn More

Chevron Australia

Barrow Island, Western Australia, Australia

Kellogg Joint Venture - Gorgon (KJV-G)

Clough, as part of Kellog​​g Joint Venture, is participating in Australia’s largest ever reso​urce project through a contract to Engineer, Procure and Construction Manage (EPCM) the LNG downstream and logistics portion of the Chevron-operated Gorgon LNG Project.

The LNG facility consists of three 5 million tonne per annum (MTPA) LNG trains, gas processing and treatment facilities, product storage and offloading, complete offsites, utilities and accommodations; including a 300TJ/d domestic gas plant. The EPCM effort is a modular construction strategy to minimize impact on the island during the construction phase and is being conducted from two main operating centres locate​d in Perth and London with support from global centres in USA, Singapore, Indonesia and Japan.

Murray Basin Stage 2 Development
Murray Basin Stage 2 Dev...Learn More

Murray Basin Stage 2 Development

Learn More

Iluka Resources Limited

Ouyen, Victoria, Australia

The Murray Basin Stage 2 Development include the upgrade to Iluka’s existing mineral separation plant in Hamilton. The EPCM contract includes construction of a re-locatable mining unit weighing approximately 900 tonnes and concentrator plants, together with associated infrastructure

The award of this EPCM contract followed completion of a Definitive Feasibility Study, which was successfully undertaken by Clough on behalf of Iluka.

 

Newmont Boddington Gold EPCM
Newmont Boddington Gold ...Learn More

Newmont Boddington Gold EPCM

Learn More

Newmont Boddington Gold Mine JV

Boddington, Western Australia, Australia

Aker Kvaerner Clough Murray & Roberts Joint Venture

Clough Limited, as part of a joint venture with Murray & Roberts and Aker Solutions, was engaged by the participants in the Boddington Gold Mine to develop the 35 Mtpa Boddington Copper/Gold project which is located 135 kilometers south-east of Perth. The contract included full EPCM management of the project.

Rio Tinto

Perth, Western Australia, Australia

Kvaerner Clough Joint Venture

The Kvaerner Clough Joint Venture (KCJV), was awarded the engineering, procurement and construction management (EPCM) contract, for the HIsmelt Kwinana Plant project. The scope of works included procurement of select process equipment from technology package providers, together with other general items of equipment from various manufacturers. Fabrication of process vessels, structural steelwork and pipework was undertaken through construction contracts on a fabrication and erection basis.

The completed HIsmelt Kwinana Plant produces approximately 800,000 tonnes per annum of high quality pig iron using low grade iron ore as feed stock.

Woodside Energy Limited

Karratha, Western Australia, Australia

Kellogg Joint Venture

Clough, as part of a the Kellogg Joint Venture completed the EPCM Phase IV which included: LNG train 4, sulfinol unit, power generation unit, other utilities, brownfields interconnecting racks, tie-ins and trunkline onshore terminal (BOD and FEED initially).

HiSmelt process plant
HiSmelt process plantLearn More

HiSmelt process plant

Learn More

Rio Tinto

Perth, Western Australia, Australia

Kvaerner Clough Joint Venture

The Kvaerner Clough Joint Venture (KCJV), was awarded the engineering, procurement and construction management (EPCM) contract, for the HIsmelt Kwinana Plant project. The scope of works included procurement of select process equipment from technology package providers, together with other general items of equipment from various manufacturers. Fabrication of process vessels, structural steelwork and pipework was undertaken through construction contracts on a fabrication and erection basis.

The completed HIsmelt Kwinana Plant produces approximately 800,000 tonnes per annum of high quality pig iron using low grade iron ore as feed stock.

Woodside LNG Expansion Project – EPCm Phase IV
Woodside LNG Expansion P...Learn More

Woodside LNG Expansion Project – EPCm Phase IV

Learn More

Woodside Energy Limited

Karratha, Western Australia, Australia

Kellogg Joint Venture

Clough, as part of a the Kellogg Joint Venture completed the EPCM Phase IV which included: LNG train 4, sulfinol unit, power generation unit, other utilities, brownfields interconnecting racks, tie-ins and trunkline onshore terminal (BOD and FEED initially).