Snowy Hydro

New South Wales, Australia

Future Generation

The Clough Salini joint venture, Future Generation, was awarded the AU$5.1bn contract for the Civil and Electro-Mechanical works for the Snowy 2.0 Project. 

Snowy 2.0 will link two existing Snowy Scheme dams, Tantangara and Talbingo, through underground tunnels to the depths of up to one kilometre and an underground power station with pumping capabilities. Snowy 2.0 will add 2,000 megawatts of energy generation and provide 175 hours of energy storage for the National Electricity Market, enough to ensure the stability and reliability of the system during prolonged weather events, such as wind or solar droughts. Snowy Hydro already plays a critical role in ensuring system stability at times of peak demand, and Snowy 2.0 will enhance this existing capability and ensure that we can continue to provide increased stability and security to the energy market well into the future.

Rio Tinto

Wickham, Pilbara, Western Australia, Australia

Clough were contracted by Rio Tinto to complete FEED, detailed design & procurement support for the Cape Lambert Power Station near Wickham in Western Australia’s Pilbara region. In parallel Clough conducted a concept analysis evaluating the most economic method for staging power output to match the forecast demand curve.

Scope includes: site establishment, earthworks including powerstation pad and roadworks, access road, abutments, sedimentation pond, evaporation pond and embankments, access road, Site drainage, installation of two GTG Packages steam cycle equipment, including one ACC, one STG Unit and all BOP, design and installation of a sewage treatment plant in accordance with specifications and datasheets

Clough engineers, constructs, commissions and maintains critical facilities for the Mining, Energy, and Infrastructure industries.

Snowy 2.0
Snowy 2.0Learn More

Snowy 2.0

Learn More

Snowy Hydro

New South Wales, Australia

Future Generation

The Clough Salini joint venture, Future Generation, was awarded the AU$5.1bn contract for the Civil and Electro-Mechanical works for the Snowy 2.0 Project. 

Snowy 2.0 will link two existing Snowy Scheme dams, Tantangara and Talbingo, through underground tunnels to the depths of up to one kilometre and an underground power station with pumping capabilities. Snowy 2.0 will add 2,000 megawatts of energy generation and provide 175 hours of energy storage for the National Electricity Market, enough to ensure the stability and reliability of the system during prolonged weather events, such as wind or solar droughts. Snowy Hydro already plays a critical role in ensuring system stability at times of peak demand, and Snowy 2.0 will enhance this existing capability and ensure that we can continue to provide increased stability and security to the energy market well into the future.

Cape Lambert Power Station EPCM
Cape Lambert Power Stati...Learn More

Cape Lambert Power Station EPCM

Learn More

Rio Tinto

Wickham, Pilbara, Western Australia, Australia

Clough were contracted by Rio Tinto to complete FEED, detailed design & procurement support for the Cape Lambert Power Station near Wickham in Western Australia’s Pilbara region. In parallel Clough conducted a concept analysis evaluating the most economic method for staging power output to match the forecast demand curve.

Scope includes: site establishment, earthworks including powerstation pad and roadworks, access road, abutments, sedimentation pond, evaporation pond and embankments, access road, Site drainage, installation of two GTG Packages steam cycle equipment, including one ACC, one STG Unit and all BOP, design and installation of a sewage treatment plant in accordance with specifications and datasheets