LNG
Liquefied Natural Gas (LNG) has triggered a revolution in the global gas market. In the past, natural gas was a regional commodity, consumed near where it was produced and transported by pipelines. Today liquefaction technology enables natural gas to be reduced to 1/600th of its original volume and transported by LNG ships across the globe.
Clough is the project delivery partner of choice for LNG projects in Australiasia. Our core competencies in engineering and construction combined with local expertise and strategic partnerships ensures consistent project success for our LNG clients. Clough's capabilities include:
Liquefaction and Regasification:
Marine infrastructure (in conjunction with BAM International bv as part of the Bam Clough Joint Venture):
- Approach jetties
- LNG loading platforms
- Dolphin berthing structures
- Roadways
- Piping support structures
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
Related Projects
 |
|
PNG LNG Jetty Client: Chiyoda JGC Joint Venture Location: Gulf of Papua, Papua New Guinea Year: August 2010 - Current JV: BAM Clough Joint Venture Scope of work: Design and construction of a 2.4km long trestle with substation platform, loading platform and single berth as well as fabrication and construction of the topsides for the PNG LNG condensate offloading jetty, located twenty kilometres northwest of Port Moresby on the coast of the Gulf of Papua.
|
|
|
|
 |
|
PNG LNG Gas Gathering Plant EPC4 Client: ExxonMobil Location: Southern Highlands, Papua New Guinea Year: December 2009 - Current JV: CBI Clough Joint Venture Scope of work: Scope includes the EPC work for the gas conditioning plant, nearby wellheads and associated piping and infrastructure, to be located in the Southern Highlands of Papua New Guinea.
|
|
|
|
 |
|
PNG LNG Upstream Infrastructure Client: ExxonMobil Location: Southern Highlands, Papua New Guinea Year: May 2009 - Current JV: Clough Curtain Joint Venture (CCJV) Scope of work: Scope includes the construction of roads, bridges, wharf, laydown and camp areas, and other critical infrastructure associated with the PNG LNG project.
|
|
|
|
 |
|
Gorgon EPCM Client: Chevron Australia Location: Barrow Island, Western Australia Year: January 2005 - Current JV: Kellogg Joint Venture - Gorgon (KJV-G) Scope of work: KJV-G is undertaking both the Front End Engineering Design (FEED) contract and Engineering, Procurement and Construction Management (EPCM) contract for all downstream facilities on the Gorgon LNG Project.
|
|
|
|
 |
 |
Pluto LNG Jetty Berth Client: Woodside Energy Limited Location: Karratha, Western Australia Year: November 2007 - December 2009 JV: BAM Clough Joint Venture Scope of work: The 300 metre long approach LNG jetty berth includes a 40 x 50 metre platform, four breasting dolphins, six mooring dolphins and navigational aids. Construction utilised the IB909 jack up barge with enhanced lifting capacity.
|
|
 |
|
Woodside LNG Jetty - Train V Expansion Client: Woodside Energy Limited Location: Dampier, Western Australia Year: December 2005 - April 2007 JV: Harbourworks Clough Joint Venture (now BAM Clough Joint Venture) Scope of work: Construction of a second LNG loading berth at Woodside's Karratha onshore gas plant. The extension to the existing marine terminal provides an additional new berth for LNG tankers with capacities of up to 145,000m3.
|
|
|
|
 |
|
LNG Expansion Project - EPCm Phase IV Client: Woodside Energy Limited Location: Western Australia Year: April 2001 - June 2004 JV: Kellogg Joint Venture Scope of work: Clough, as part of a the Kellogg Joint Venture completed the EPCm Phase IV which included: LNG train 4, sulfinol unit, power generation unit, other utilities, brownfields interconnecting racks, tie-ins and trunkline onshore terminal (BOD and FEED initially).
|
|
|
|
 |
|
LNG Marine Structures Phase 1 & 2 Client: Woodside Energy Limited Location: Western Australia Year: June 1983 - April 1984 / August 1985 - December 1987 JV: Harbourworks Clough Joint Venture (now BAM Clough Joint Venture) Scope of work: The Harbourworks Clough Joint Venture completed Phase 1 which included the supply, fabrication and installation of ten large single pile dolphins. Phase 2 consisted of the construction of the LNG and Condensate Load Out Jetty, the first structure of its kind ever built in Australia.
|