Fabrication
Clough combines project expertise with Asian industry to deliver the quality, low cost fabrication of highly engineered modularised structures for upstream oil and gas projects.
Capabilities include:
- Conventional platforms – Jackets and topsides
- Oil and gas process modules
- Self installing ACE platforms
- FPSO topside modules,
- Pre-assembled modules for petrochemical and offshore platforms
- Onshore modular fabrication for the mining and minerals sector
Strategically located on the eastern seaboard of the Gulf of Thailand, our Sattahip fabrication facility features:
- Secure facilities with direct access to deepwater wharfage
- Excellent transportation links
- 80,000m² all weather compacted yard surface
- Water depth at quayside of 12.5 metres
- Jetty height of 3.5 metres above water level
- Loadout jetty with 2,500 tonne capacity
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
![]() |
Devil Creek Module Engineering, Procurement, Fabrication & Assembly Client: Apache Energy Limited Location: Western Australia Year: March 2009 - January 2011 Scope of work: Onshore engineering, procurement and module fabrication for the Devil Creek Development Project, located in the north west of Western Australia |
|
![]() |
NuCoastal Songkhla Fabrication |
|
![]() |
Montara Topside Modules |
|
![]() |
GFI Offshore Field Development |
|
![]() |
Vetco Ettrick FPSO Modules Client: Aibel Bluewater Location: Thailand Year: September 2006 - December 2007 Scope of work: Fabrication of five topside process modules with a combined weight of about 1,800 tonnes which were installed on the Aoka Mizu FPSO, at Nexen's Ettrick Field. |
|
![]() |
Alcan Gove Third Stage Expansion Client: Alcan Gove Development Pty Limited Location: Northern Territory, Australia JV: Clough Sino-Thai Year: January 2005 - June 2006 Scope of Work: Clough with partner Sino-Thai, undertook the fabrication of the Process Area Modules for the Alcan Gove Third Stage Expansion that included fabrication and assembly of around 120 modular units with a total delivered weight from 14 shipments of some 27,000 tonne. Work activities entailed all structural steel, process equipment, pipework, electrical and instrumentation systems and were pre-commissioned prior to transport to site for final positioning, hook-up and commissioning. |





