Marine

Clough has over 50 years of history in jetty and marine infrastructure design and construction. The company has executed major marine facility projects across Australia, Sub Saharan Africa, South East Asia, Papua New Guinea and the Middle East, and specialises in delivery in remote and logistically challenging environments.

Capabilities include:

  • Import and Export Jetties
  • Jetty Topsides
  • Ports and Harbour Infrastructure
  • Quay Walls
  • MOFs
  • Intake and Outfall Structures
  • Regasification Terminals
  • Near Shore Pipelines
  • Tug Pens
  • Supply Bases
  • Marine Engineering

Related Projects

  • Anderson Point Facility (AP5)

    Anderson Point Facility (AP5)

    Client

    Fortescue Metals Group

    Location

    Port Hedland, Western Australia

    JV

    BAM Clough

    Scope of Work

    Design and construction of a 306-metre long wharf extension, seven berthing dolphins, and the supply and installation of wharf conveyor modules.

  • Ichthys Project Onshore Facilities Product Loading Jetty

    Ichthys Project Onshore Facilities Product Loading Jetty

    Client

    JKC Australia LNG Pty Ltd (JKC) (a joint venture between JGC Corporation, KBR and Chiyoda Corporation)

    Location

    Darwin, Northern Territory

    JV

    BAM Clough

    Scope of Work

    Design and construction of two separate vessel load-out berths, one for LNG carriers and a second for LPG / condensate carriers.

  • Ichthys Project Onshore Facilities Module Offloading Facility (MOF)

    Ichthys Project Onshore Facilities Module Offloading Facility (MOF)

    Client

    JKC Australia LNG Pty Ltd (JKC) (a joint venture between JGC Corporation, KBR and Chiyoda Corporation)

    Location

    Darwin, Northern Territory

    JV

    BAM Clough

    Scope of Work

    Design and construction of the Ichthys LNG MOF, a key facility for offloading modules to assemble the LNG liquefaction plant.

  • Wheatstone Project Jetty

    Wheatstone Project Jetty

    Client

    Bechtel

    Location

    Ashburton North, Westen Australia

    JV

    BAM Clough

    Scope of Work

    Design and construction of a 1.2 kilometre jetty with operations platform, a product loading platform with a single LNG and condensate load out berth, and associated piping modules and piping installation.

  • PNG LNG Project Marine Jetty

    PNG LNG Project Marine Jetty

    Client

    Bechtel Chiyoda JGC Joint Venture

    Location

    Caution Bay, Papua New Guinea

    JV

    BAM Clough

    Scope of Work

    Design and construction of a 2.4km long trestle with substation platform, loading platform and single berth. Scope included fabrication and construction of the topsides.

  • PNG LNG Project Marine Jetty Topsides and Pipe Racks Fabrication

    PNG LNG Project Marine Jetty Topsides and Pipe Racks Fabrication

    Client

    Chiyoda JGC Joint Venture

    Location

    Thailand

    Scope of Work

    Supply, fabrication, coating, assembley and testing of all structural steel, cryogenic and utility piping, and installation of cable tray associated with the topsides and piperack modules for the PNG LNG Jetty Project in Papau New Guinea.

  • Pluto LNG Jetty

    Pluto LNG Jetty

    Client

    Woodside Energy Limited

    Location

    Karratha, Western Australia

    JV

    BAM Clough

    Scope of Work

    Design and construction of a 300 metre long approach LNG jetty including a 40 x 50 metre platform, four breasting dolphins, six mooring dolphins and navigational aids.

  • LNG Jetty - Train V Expansion

    LNG Jetty - Train V Expansion

    Client

    Woodside Energy Limited

    Location

    Dampier, Western Australia

    JV

    Harbourworks Clough Joint Venture (now BAM Clough Joint Venture)

    Scope of Work

    Construction of a second LNG loading berth at Woodside's Karratha onshore gas plant. The extension to the existing marine terminal provided an additional new berth for LNG tankers with capacities of up to 145,000m3.