Water
Population growth and environmental changes have resulted in an urgent need for the creation and ‘harvesting’ of water within Australia.
Clough has over 40 years experience in delivering innovative solutions to water projects. Over time we have developed our design and construct capability to world class, frequently in partnership with water and wastewater treatment technology providers and specialist consultant designers.
Our capabilities within the water sector include:
- Reservoirs and tanks
- Pipelines
- Pump Stations
- Wastewater and water treatment plants
Clough has a proven track record of delivering water and wastewater projects in urban and remote regions, and has a solid core of experienced personnel to deliver a wide variety of future water and wastewater projects.
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
Related Projects
![]() |
|
||
![]() |
Kalgoorlie 400ML Reservoir Client: Water Corporation of WA Location: Kalgoorlie, Western Australia Year: 2008 (completed) Alliance: WaterHorizon Alliance Scope of work: WaterHorizons is an alliance established between the Water Corporation, Clough and Kellogg Brown & Root to design and construct the Kalgoorlie 400 megalitre balancing reservoir and associated works. |
||
![]() |
Woodman Point Environmental Enhancement Project Client: Water Corporation of WA Location: Woodman Point, Western Australia Year: 2002 Alliance: Woodman Alliance Scope of work: The major upgrade of existing facilities included a 125 megalitres per day primary treatment plant and a 2,800 litres per sec pump station, which is located approximately 2.7km from the plant. Clough and Kinhill Brown & Root were chosen by the Water Corporation to form the Woodman Alliance. |
||
![]() |
Bundeena - Maianbar Water Cycle Management Scheme Client: Sydney Water Location: New South Wales, Australia Year: 2002 JV: Clough Lucas Joint Venture Scope of work: A design and construct project with a significant interface with the public as well as environmental management controls. The comprises water and sewer reticulation to households in Bundeena and Maianbar as well as pumping stations and directional drilling. |
||
![]() |
Ballarat Water Treatment Project Client: Thames Water Ballarat Pty Ltd Location: Ballarat, Victoria, Australia Year: 2001 Scope of work: Design and construction of two water treatment plants at Lal Lal and White Swan reservoirs. Each plant has a capacity of 65 megalitres per day together with associated pumping stations, clear water storages and water mains. |
||
![]() |
Millmerran Water Supply Client: Intergen Australia Pty Ltd Location: Millmerran, Queensland, Australia Year: 2000 Scope of work: Supply and install 97km of ductile iron cement lined pipe to transfer treated effluent from Wetalla Water Treatment Plant in Toowoomba to a new 840 Megawatt coal fired power station at Millmerran, in southern Queensland. |





