Domestic Gas Plants

Clough has the in-house ability to deliver full project life cycle solutions to domestic gas processing facilities in Australia and Papua New Guinea. For our clients this means a single interface throughout the life of the project, significantly reducing the risk, costs and time involved to complete the project.

Our domestic gas plant capabilities include:

  • Conceptual and Front End Engineering Design
  • EPC/EPCM for upstream gas processing facilities
  • Fabrication
  • Marine infrastructure including jetties
  • Onshore and offshore asset support


Our difference is strong front end engineering and the benefit of local experience, interface management and construction know how.

This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Related Projects

devil_creek  

Devil Creek Development Project
Client: Apache Energy Limited
Location: 40km south west of Dampier, Western Australia
Year: 2010
Scope of Work: Engineering, procurement and module fabrication for the Devil Creek Development Project onshore facility.

     
  Macedon Gas Field Development - FEED
Client:
BHP Billiton
Location: Northern Carnarvon Basin, Western Australia
Year: 2010
Scope of work: Contracted to complete the FEED engineering study for the development of BHP Billiton's $1 billion Macedon domestic gas project off Exmouth.
     
  Mars Phase 2A Installation
Client:
Apache Energy Limited
Location: Varanus Island, Western Australia
Year: 2009
Scope of work: Installation of an additional solar compressor with associated pipe work and instrumentation on the existing Varanus Island plant.
     
  Hegigio Pipe Bridge
Client:
Oil Search Limited
Location: Papua New Guinea
Year: 2005
Scope of work: The scope of the project included the supply, fabrication, assembly and erection of a cable-stayed suspension bridge spanning 470m across the Hegigio Gorge. The southern abutment was constructed on an existing live well pad and the only access to the northern abutment is via helicopter.
     
  Yolla Field Project
Client:
Origin Energy
Location: Victoria, Australia
Year: 2004
Scope of work: This contract included EPIC of 75MMSCFD onshore gas plant and 32km x 350mm onshore pipeline and associated smaller pipelines as part of the Yolla Field development. The work scope also included an offshore production platform and 147km x 350mm subsea pipeline.
     
  Sawan Gas Field Development
Client:
OMV Pakistan
Location: Thar Desert, Pakistan
Year: 2003
Scope of work: Contract included engineering, procurement, construction EPCC contract for a greenfields gas plant consisting of two identical process trains each of 170MMSCFD capacity (including MDEA amine systems) and all associated infrastructure including 20km access road; 15km 20" sales gas export pipeline, airstrip, permanent accommodation, recreation, workshop and warehousing facilities.
     
  Lakshmi Gas Field Development
Client:
Cairn Energy India
Location: India
Year: 2002
JV: Hyundai
Scope of work: Engineering, procurement, construction, transportation, installation and commissioning for two topsides of wellhead platforms, submarine pipelines with shore pull and onshore terminal facilities for the treatment of well fluid prior to export. The onshore plant dehydrates and compresses the gas for export. The two process trains have a throughput of 75MMSCFD each.
     
  Roma to Brisbane Pipeline Looping Stages 4, 5 and 6
Client:
Agility
Location: Queensland
Year: 2002
JV: AJ Lucas
Scope of work: EPC for 140km x 400NB gas pipeline duplication (looping) of existing Roma to Brisbane pipeline, 11km x 400NB lateral gas pipeline to Swanbank Power Station, 10km x 250NB gas pipeline extension to Scotia gas field. Included associated valve stations, scraper/ receiver stations and other pipeline facilities.