Clough delivers solutions to the subsea construction market, with our scope ranging from EPIC to installation-only of subsea facilities. Our goal is to deliver the best project outcomes for our clients by effectively combining state-of-the-art engineering solutions with practical construction, installation, operations and maintenance expertise. Capabilities include:

  • Subsea construction, umbilicals, risers and flowlines (SURF)
  • Subsea structures / manifolds / riser-bases / protection structures
  • Spools and tie-in systems
  • FPSO or TLP moorings installation and and hookup
  • Full Subsea field installations including all the above
  • Inspection, repair and maintenance (IRM) and light construction


Clough's experience encompasses the delivery of projects in water depths ranging from 0 to 2,200 metres throughout the oil and gas provinces of the world. Our leading edge subsea construction vessels, the Normand Clipper and Normand Clough offer specialist deepwater construction to clients worldwide.

This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Related Projects

     

Normand Clough Charter: Wild Well Control
Client: Wild Well Control Inc
Location: Gulf of Mexico
Year: 2010
Scope of work: Provided associated subsea intervention services for offshore platform decommissioning and subsea construction works.

     

Neptune LNG Deepwater Port Terminal
Client: Advanced Production & Loading (APL)
Location: Offshore Boston, USA
Year: 2009
Scope of work: Provided offshore installation and construction activities, carried out by subsea construction vessel Normand Clipper.

     

Hurricane Repair Works
Client: Apache Corporation Limited
Location: Gulf of Mexico
Year: 2009
Scope of work: Provided the subsea construction vessel Normand Clipper, associated logistics and engineering support to perform subsea work.

     
  Basker Manta Subsea Installation
Client: Upstream Petroleum
Location: Bass Strait, Victoria, Australia
Year: 2006
Scope of work: A subsea construction contract to perform the installation and diverless tie-in of various subsea flowlines and control umbilicals. All construction activity is located in the Gippsland Basin, in water depths of 160 metres.
     
  SBM Belanak CALM Buoy and Mooring System
Client:
SBM-Imodco inc
Location: Natuna Sea, Indonesia
Year: 2006
Scope of work: Installation of an offshore LPG-FSO mooring system that included the installation and commissioning of a CALM buoy and moorings, risers, an umbilical, and offloading floating hoses and hawsers for use with a LPG-FSO in the Belanak Field.
     
  Canyon Express Umbilical Installation
Client: Elf Exploration Inc
Location: Gulf of Mexico
Year: 2002
JV: Sonsub Clough Partnership
Scope of work: This contract included the loadout, transport and installation of the subsea control umbilicals and control system components. The umbilical comprised of the main control line from platform in 90m water to three subsea fields in water depths from 1,900m to 2,200m. At commissioning, the Canyon Express Development was the world’s deepest producing gas field.
     
  Åsgard B&C Moorings Installation
Client:
Statoil
Location: Asgard Field, North Sea
Year: 2000
JV: SaiClo Rockwater Saipem Joint Venture
Scope of work: SaiClo working in partnership with the Rockwater Saipem Joint Venture was awarded the contract for the installation of the moorings for the Asgard 'B' FPSO and the Asgard ‘C' FSU and subsequent tow out and hookup of the 'B' FPSO. The Asgard ‘C' scope also included installation of a STL buoy located in 330m water depth.
     
  Troll Structures Installation
Client: Norsk Hydro
Location: North Sea, Norwegian Sector
Year: 2000
JV: SaiClo Rockwater Joint Venture
Scope of work: The Troll Structures installation was undertaken in a number of phases over three years. The total scope encompassed 24 structures installed by the MSV Maxita, the quickest taking just 4.5 hours. The scope of work in 1999 involved the installation of the world’s first subsea separation skid (“Pilot-plant”) that was the heaviest of the structures at around 400 tonne.
     
  Bouri Subsea Wells
Client:
Saipem SpA/AGIP Libya
Location: Bouri Field, Libya
Year: 1999
JV: SaiClo JV
Year: 1999
Scope of work: Installation works associated with Bouri Phase 2 offshore Libya. This involved tieback of 3 new subsea wells to an existing platform. The wells range from 6km to 10km from the platform. Each well was serviced by a flexible flowline and control umbilical.
     
  Aquila Field Development
Client: Saipem SpA/AGIP
Location: Aquila Field, Adriatic Sea
JV: SaiClo JV
Year: 1998
Scope of work: Offshore installation for the Aquila field including moorings installation (suction anchors, chain and wire), FPSO tow and installation and flowlines and umbilicals installations to two wellheads in water depths of 850 metres.